Project spotlight127-Unit Lifting-Equipment Export Programme Begins for an Egyptian Steel Plant
127 crane and equipment sets for an Egyptian steel plant. First export dispatch began on 3 September 2026.
Follow the dispatchBridge cranes for workshops and production lines.
Explore Overhead Cranes
Ground-supported lifting for yards and construction.
Explore Gantry Cranes
Wire rope and chain hoists for lifting points and cranes.
Explore Electric Hoists

Wire rope lifting and pulling with a powered drum.
Explore Electric Winches
Grab buckets, magnets and hooks for your load.
Explore Lifting Attachments & Grabs
Mobile handling for containers, precast and yard loads.
Explore Rubber-Tired Gantry Cranes & Straddle Carriers

Lift and move vessels through boatyards and marinas.
Explore Marine Travel Lifts
Ladle, slab, scrap and coil handling across steel production.

Container stacking and cargo transfers across terminals and rail.

Turbine installation, powerhouse maintenance and wind equipment assembly.

Controlled component transfer and positioning for precision assembly.

Heavy fabrication, production lifting and factory crane automation.

Process lifting for smelters, carbon blocks and anode materials.

Clean lifting and classified protection for sensitive process areas.

Bridge fabrication, metro construction and ship block assembly.

Automated storage and retrieval for plates, cables and bins.

Follow project dispatches, crane engineering and factory acceptance.

Dispatch, installation and equipment in service

Crane configurations and handling technology

Factory inspections, acceptance and test programmes

Company developments, people and community programmes
Follow crane deliveries, equipment developments and factory inspections. See the work behind your next lifting project.
Project spotlight127 crane and equipment sets for an Egyptian steel plant. First export dispatch began on 3 September 2026.
Follow the dispatchExplore deliveries, engineering and factory quality updates. Company news remains available in the complete archive.
180 updates for crane buyers
No updates match these filters. Try another topic, year or keyword.
Page 20 of 20 · Showing 172–180
The first deliveries under Henan Mine’s 120,000-tonne steel purchase programme arrived on 6 November 2021.
Read updateCranes for Baosteel’s Baoshan base passed a factory A-inspection on 26–28 October 2021.
Read updateThree crane-standardisation organisations held an exchange at Henan Mine’s intelligent industrial park on 22 October 2021.
Read updateHenan Mine’s October 2021 aerospace programme included more than sixty cranes and equipment sets.
Read updateHenan Mine began a nine-day skills programme on 7 October 2021.
Read updateHenan Mine’s crane batch for Baosteel’s non-oriented silicon-steel project passed a factory A-inspection on 27–29 September 2021.
Read updateHenan Mine supplied new-design cranes for Windey’s wind-turbine manufacture and assembly programme in September 2021.
Read updateHenan Mine profiled Wang Guangliang’s service work at a Jigang project in August 2021.
Read updateHenan Mine’s 2021 profile of Ma Peiqin traces his development from welder to double-girder team leader.
Read updateShare the load, working area, lifting height and operating conditions. Site drawings and process layouts help define the equipment.