Coordinate site delivery
Match crane arrival and erection to the powerhouse build schedule.
Powerhouse construction needs reliable high-capacity lifting at a remote project site, with delivery and installation interfaces planned before the plant is complete.
Henan Mine Crane equipment for Morowali thermal power project
Powerhouse construction needs reliable high-capacity lifting at a remote project site, with delivery and installation interfaces planned before the plant is complete.
Specify the bridge cranes from the heaviest unit, construction sequence and building layout. Confirm runway completion, hook coverage, low-speed positioning and handover tests so the same equipment can support later maintenance.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Match crane arrival and erection to the powerhouse build schedule.
Move the unit from its laydown point to the installation centerline.
Test controls and preserve future maintenance access.
These choices affect safety, process fit and the operating life of the installation.
Check temporary access, power and runway readiness at the overseas site.
Do not size only for the first installation lift; review overhaul duties too.
See how cranes and lifting systems were configured for demanding operating environments.

The project used two 120 t new-design double-girder bridge cranes for an Indonesian thermal plant project involving three 380 MW generating units.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗