| Destination region | Southeast Asia |
| Programme | More than 100 cranes and equipment sets |
| Published overhead capacity | 160 t |
| Equipment applications | Production lifting, material transfer and port scrap handling |
Different lifting tools for different steelworks tasks
The equipment covers production lifting, material transfer and scrap loading. Slab tongs provide a mechanical gripping arrangement for slab handling, while the lower-rotating electromagnetic beam equipment combines magnetic lifting with an arrangement for changing load orientation.
The 160 t double-girder overhead cranes form part of a mixed equipment package. Separate machines and attachments serve workshop lifting, slab transfer and the port scrap yard.
Double-trolley gantries for the port scrap yard
Double-girder, double-trolley gantry cranes were supplied in batches for the project’s port scrap-storage area. Their configuration addresses handling outside the workshop and the movements needed between storage and loading positions.
For a comparable yard, crane rail geometry, stockpile layout and vehicle access need to be reviewed together. The lifting tools and trolley arrangement should suit the actual scrap form and loading sequence.
Build a position-by-position equipment schedule
Provide a lifting schedule covering each steelworks area, with load type, temperature, maximum weight and attachment weight. Include workshop headroom, yard drawings and the required operating cycles for each position.
For slab or magnetic handling, specify product dimensions, surface conditions and how the load must be oriented at pickup and placement. Comparing quotations against those tasks makes the different crane and attachment configurations visible.
Photographs from this update
































