Filled ladle and beam mass
360 t Casting Crane for Steel Production
A 360 t ladle lift places high demands on bridge alignment, drive control and availability during steel production.

Start with the load and the process route.
A 360 t ladle lift places high demands on bridge alignment, drive control and availability during steel production.
The crane, lifting attachment, building interface and control sequence need to be reviewed as one operating system.
Prepare the technical brief ↗Span and route drawings
Production duty and downtime target
Drive, monitoring and redundancy scope
Make high-capacity ladle travel smooth and inspectable.
Use a casting-crane arrangement designed around the filled ladle, production route and runway. Coordinate bridge fabrication accuracy, controlled acceleration, fault diagnosis and redundant mechanisms so the lifting sequence can be operated and maintained reliably.

Confirm full lift mass
Include the filled ladle and all lifting gear in the capacity basis.
Control the route
Plan slow-speed positioning near the furnace and pouring stations.
Inspect each cycle
Use monitoring and diagnostic information to support maintenance decisions.
Drive and brake behavior
Specify controlled starts, stops and holding at the heaviest load.
Redundancy and service access
Define which mechanisms need backup and how maintenance will be performed.
Luzhou Xinyang casting-crane installation
The project used a 360 t casting crane in service at a steel plant with 2 million-ton production capacity, using controlled drives, fault diagnosis and redundant mechanisms.






Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Load and attachment | Filled ladle and beam mass | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Plant geometry | Span and route drawings | Crane span, lifting height, headroom, wheel loads and runway or foundation interfaces. |
| 03 / Operating duty | Production duty and downtime target | Duty classification, speeds and control behaviour matched to the agreed operating cycle. |
| 04 / Environment and controls | Drive, monitoring and redundancy scope | Protection, positioning, interlocks, monitoring and safe recovery requirements. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.
Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the crane be customized for our plant?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send the 360 t casting crane for steel production brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.
Send your project requirements ↗
























