List bay duties
Separate production loads, rolls, parts and maintenance lifts.
A large hot-rolling operation needs multiple cranes with different loads and duty cycles across production and service areas.
Henan Mine Crane equipment for Panhua Group hot-rolling project
A large hot-rolling operation needs multiple cranes with different loads and duty cycles across production and service areas.
Map handling tasks bay by bay, then choose double-girder bridge cranes with capacities, hook approaches and controls matched to each station. Standardize interfaces where possible without forcing unlike lifts into one configuration.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Separate production loads, rolls, parts and maintenance lifts.
Match each crane's span, lift height and capacity to its bay.
Coordinate spares, inspections and downtime across the full installed group.
These choices affect safety, process fit and the operating life of the installation.
Size each bay from its heaviest real load and cycle, not the fleet's maximum unit.
Coordinate crane delivery and commissioning with rolling-line construction.
See how cranes and lifting systems were configured for demanding operating environments.

Henan Mine Crane delivered 34 double-girder bridge cranes with capacities from 10 t to 100 t for a 4.5 million-ton annual hot-rolling project in Chongqing.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗