72 m-Span Gantry Crane for Jianzhou Bridge Construction
A 72 m-span crane handled steel bridge construction across the Tuojiang River and an adjacent road corridor.

The project and its handling task.
Henan Mine Crane’s 72 m-span crane served the Jianzhou Bridge construction project in Jianyang. The equipment crossed the Tuojiang River and the Airport Avenue corridor during the steel bridge works.
The bridge uses a fully welded, variable-section continuous steel box-girder design and has a total length of 580.5 m. The bridge project’s geometry created demanding structural lifting requirements, and the equipment was selected after technical discussion and evaluation.
Cover a long steel-box-girder work area with stable crane travel.
A long bridge segment may need a crane to span roads, river-adjacent work and wide temporary assembly zones.
Plan load pickup and temporary support for the changing box-girder section.
Verify clearance over roadway and site obstacles.
Align the steel segment with the next assembly support.
Align the steel segment with the next assembly support.

The equipment behind this project.
The bridge uses a fully welded, variable-section continuous steel box-girder design and has a total length of 580.5 m. The bridge project’s geometry created demanding structural lifting requirements, and the equipment was selected after technical discussion and evaluation.
- Crane span72 m
- Project locationJianzhou Bridge, Jianyang
- Handling applicationSteel bridge construction
- Civil structureFully welded variable-section continuous steel box girder
- Project milestoneBridge completed and opened to traffic
What to compare with your own project.
Match the project configuration to your load, layout and operating sequence before selecting a crane package.
| Design area | This project configuration | Define for your site |
|---|---|---|
| Crane span | 72 m | Box-girder segment mass. Define the required operating envelope and acceptance checks in your technical brief. |
| Project location | Jianzhou Bridge, Jianyang | Full span and runway drawing. Define the required operating envelope and acceptance checks in your technical brief. |
| Handling application | Steel bridge construction | Wind and site-access plan. Define the required operating envelope and acceptance checks in your technical brief. |
| Civil structure | Fully welded variable-section continuous steel box girder | Assembly support and alignment method. Define the required operating envelope and acceptance checks in your technical brief. |
| Project milestone | Bridge completed and opened to traffic | Box-girder segment mass. Define the required operating envelope and acceptance checks in your technical brief. |
See the equipment and working environment.
Explore the equipment arrangement and handling environment.


Bridge construction completed.
The crane supported construction of the completed Jianzhou Bridge. Its wide lifting coverage addressed the river and road-corridor geometry of the steel-structure project.
For a similar project, set the 72 m crane span from the box-girder fabrication route and site obstructions. Check runway alignment, wind exposure, rigging and placement sequence before any heavy segment is moved.
Prepare a comparable crane quotation.
Share the load schedule and site drawings. Set the 72 m crane span from the box-girder fabrication route and site obstructions. Check runway alignment, wind exposure, rigging and placement sequence before any heavy segment is moved.
We can quote a single crane or a coordinated fleet. The offer sets out the destination standards, required certificates and inspection records, manufacturing programme after drawing approval, shipment, installation support and agreed acceptance scope.
- Box-girder segment mass
- Full span and runway drawing
- Wind and site-access plan
- Assembly support and alignment method
- Destination standards, quantity and inspection documentation
- Manufacturing programme, shipment, commissioning, training and spares
Questions before specifying a similar crane.
Can the same project crane be supplied for my site?
We customize the capacity, span, lifting height, attachment and controls to the load, building or yard layout and operating cycle. Box-girder segment mass is one of the inputs to review before final equipment selection.
How are certification, quantity and lead time agreed?
Single-crane and fleet enquiries are welcome. Define the destination and required standards in the enquiry. The project offer confirms certification and inspection documents, the quantity, drawing approval and manufacturing schedule, with the shipping and site-service boundaries.
What should acceptance and after-sales support include?
Agree the inspection plan, representative load and functional tests, operator training, maintenance instructions, spare-parts scope and fault-recovery procedures. For this application, include assembly support and alignment method in the technical review.
Planning a similar lifting project?
Send your layout, load and operating requirements. We can develop a customized crane package and delivery scope for your site.