12 Crane Units for China’s First Domestically Built Large Cruise Ship
Twelve crane units support component lifting and assembly within a large cruise-ship manufacturing programme.

The project and its handling task.
Henan Mine Crane supplied 12 crane units of different types for the assembly programme of China’s first domestically built large cruise ship. The lifting equipment supports the movement and placement of selected parts during ship construction.
The ship programme involves a very large number of components and coordinated assembly operations. The crane package therefore connects individual pickup and placement tasks with the shipyard’s manufacturing sequence rather than treating the vessel as one suspended load.
Coordinate many component lifts during ship final assembly.
Cruise-ship construction joins large blocks and numerous smaller systems, requiring careful crane coverage and hand-offs between trades.
Verify weight, lift points and staging at the shipyard.
Coordinate crane travel with adjacent crews and structures.
Confirm fit-up support and the next work team's access.
Confirm fit-up support and the next work team's access.

The equipment behind this project.
The ship programme involves a very large number of components and coordinated assembly operations. The crane package therefore connects individual pickup and placement tasks with the shipyard’s manufacturing sequence rather than treating the vessel as one suspended load.
- Quantity12 crane units
- ApplicationCruise-ship component lifting and assembly
- Equipment scopeMultiple crane types
- Operating focusControlled placement and coordinated assembly handling
What to compare with your own project.
Match the project configuration to your load, layout and operating sequence before selecting a crane package.
| Design area | This project configuration | Define for your site |
|---|---|---|
| Quantity | 12 crane units | Block and equipment load list. Define the required operating envelope and acceptance checks in your technical brief. |
| Application | Cruise-ship component lifting and assembly | Shipyard bay or dock layout. Define the required operating envelope and acceptance checks in your technical brief. |
| Equipment scope | Multiple crane types | Rigging and fit-up sequence. Define the required operating envelope and acceptance checks in your technical brief. |
| Operating focus | Controlled placement and coordinated assembly handling | Concurrent crane and trade schedule. Define the required operating envelope and acceptance checks in your technical brief. |
See the equipment and working environment.
Explore the equipment arrangement and handling environment.




Equipment supplied for ship assembly.
The crane equipment supported the ship’s assembly stage. The package provides handling coverage for component movement within the wider construction programme.
For a similar project, allocate cranes to the shipbuilding production stages from block transport through outfitting. Match attachments and controlled travel to component geometry while reserving access for surrounding assembly work.
Prepare a comparable crane quotation.
Share the load schedule and site drawings. Allocate cranes to the shipbuilding production stages from block transport through outfitting. Match attachments and controlled travel to component geometry while reserving access for surrounding assembly work.
We can quote a single crane or a coordinated fleet. The offer sets out the destination standards, required certificates and inspection records, manufacturing programme after drawing approval, shipment, installation support and agreed acceptance scope.
- Block and equipment load list
- Shipyard bay or dock layout
- Rigging and fit-up sequence
- Concurrent crane and trade schedule
- Destination standards, quantity and inspection documentation
- Manufacturing programme, shipment, commissioning, training and spares
Questions before specifying a similar crane.
Can the same project crane be supplied for my site?
We customize the capacity, span, lifting height, attachment and controls to the load, building or yard layout and operating cycle. Block and equipment load list is one of the inputs to review before final equipment selection.
How are certification, quantity and lead time agreed?
Single-crane and fleet enquiries are welcome. Define the destination and required standards in the enquiry. The project offer confirms certification and inspection documents, the quantity, drawing approval and manufacturing schedule, with the shipping and site-service boundaries.
What should acceptance and after-sales support include?
Agree the inspection plan, representative load and functional tests, operator training, maintenance instructions, spare-parts scope and fault-recovery procedures. For this application, include concurrent crane and trade schedule in the technical review.
Planning a similar lifting project?
Send your layout, load and operating requirements. We can develop a customized crane package and delivery scope for your site.