
400 t Gantry Crane in a 30+ Unit Chemical-Equipment Factory Package
A chemical-equipment manufacturer’s package includes more than 30 crane units and a 400 t double-girder gantry crane.
Read the project case ↗Bridge cranes for workshops and production lines.
Explore Overhead Cranes
Ground-supported lifting for yards and construction.
Explore Gantry Cranes
Wire rope and chain hoists for lifting points and cranes.
Explore Electric Hoists

Wire rope lifting and pulling with a powered drum.
Explore Electric Winches
Grab buckets, magnets and hooks for your load.
Explore Lifting Attachments & Grabs
Mobile handling for containers, precast and yard loads.
Explore Rubber-Tired Gantry Cranes & Straddle Carriers

Lift and move vessels through boatyards and marinas.
Explore Marine Travel Lifts
Ladle, slab, scrap and coil handling across steel production.

Container stacking and cargo transfers across terminals and rail.

Turbine installation, powerhouse maintenance and wind equipment assembly.

Controlled component transfer and positioning for precision assembly.

Heavy fabrication, production lifting and factory crane automation.

Process lifting for smelters, carbon blocks and anode materials.

Clean lifting and classified protection for sensitive process areas.

Bridge fabrication, metro construction and ship block assembly.

Automated storage and retrieval for plates, cables and bins.

Follow project dispatches, crane engineering and factory acceptance.

Dispatch, installation and equipment in service

Crane configurations and handling technology

Factory inspections, acceptance and test programmes

Company developments, people and community programmes
Compare factory crane fleets, heavy fabrication, machinery assembly and automated steel handling.

A chemical-equipment manufacturer’s package includes more than 30 crane units and a 400 t double-girder gantry crane.

A chemical-equipment manufacturer’s package includes more than 30 crane units and a 400 t double-girder gantry crane.
Read the project case ↗Choose the operating environment, then review the project location, equipment and delivery or acceptance stage.

A chemical-equipment manufacturer’s package includes more than 30 crane units and a 400 t double-girder gantry crane.

More than 150 crane units, including two 100 t intelligent cranes, support multiple production lines at a large industrial project.

A 750 t double-girder gantry uses synchronized lifting points, a project-specific rail arrangement and regenerative 10 kV power.

A rigid-guide-column magnet beam crane combines automatic dispatch, twin hoist motors and electro-permanent magnetic lifting.

More than 100 lifting units serve a 40,000 m² production park with 25 m-high heavy steel-structure workshops.

A fleet of more than 300 crane units supports structural production and assembly handling across XCMG operations.
A project photograph shows a reference arrangement. Your crane still needs a site-specific lifting envelope, duty, interfaces and delivery scope.
Maximum weight, rigging, pickup and placement points, travel distance and clearances.
Lifts per shift, load spectrum, temperature, wind, corrosion and protected-area classification.
Runway or rail, power feed, lifting attachment, controls, automation and emergency recovery.
Manufacturing documents, inspection, shipping limits, erection, testing, training and service.
Share drawings, loads, operating cycle and destination. We will review the technical configuration and delivery boundaries with you.