100+ Cranes for Tangxing’s Tunnelling-Equipment Factory
More than 100 lifting units serve a 40,000 m² production park with 25 m-high heavy steel-structure workshops.

The project and its handling task.
Henan Mine Crane supplied more than 100 heavy lifting units to Tangxing Equipment’s trenchless-equipment industrial park. The site covers more than 40,000 m², with heavy steel-structure workshops approximately 25 m high.
The cranes support the production of pipe-jacking and tunnelling machines, with the project stating an annual manufacturing capacity of 500 machines. The supplied crane wheels use Henan Mine Crane’s high-density near-net-forming manufacturing technology.
Serve large tunneling-machine assemblies across a high-bay factory.
Non-excavation equipment manufacturing needs repeated movement of large structures through fabrication and assembly, often across several tall workshop bays.
Define lift points and temporary supports for the largest tunneling-machine parts.
Provide hook coverage at welding and final assembly stations.
Coordinate runway traffic and inspections across the fleet.
Coordinate runway traffic and inspections across the fleet.

The equipment behind this project.
The cranes support the production of pipe-jacking and tunnelling machines, with the project stating an annual manufacturing capacity of 500 machines. The supplied crane wheels use Henan Mine Crane’s high-density near-net-forming manufacturing technology.
- Crane fleetMore than 100 lifting units
- Factory areaMore than 40,000 m²
- Workshop heightApproximately 25 m
- Production applicationPipe-jacking and tunnelling equipment
- Wheel manufactureHigh-density near-net-forming technology
What to compare with your own project.
Match the project configuration to your load, layout and operating sequence before selecting a crane package.
| Design area | This project configuration | Define for your site |
|---|---|---|
| Crane fleet | More than 100 lifting units | Largest machine component and rigging. Define the required operating envelope and acceptance checks in your technical brief. |
| Factory area | More than 40,000 m² | Bay heights and runway plan. Define the required operating envelope and acceptance checks in your technical brief. |
| Workshop height | Approximately 25 m | Assembly schedule. Define the required operating envelope and acceptance checks in your technical brief. |
| Production application | Pipe-jacking and tunnelling equipment | Fleet maintenance and traffic rules. Define the required operating envelope and acceptance checks in your technical brief. |
| Wheel manufacture | High-density near-net-forming technology | Largest machine component and rigging. Define the required operating envelope and acceptance checks in your technical brief. |
See the equipment and working environment.
Explore the equipment arrangement and handling environment.


Delivered and in use.
The cranes were delivered and put into use in the manufacturing park. Their bay coverage supports component handling and production work within the heavy equipment factory.
For a similar project, plan the crane fleet from the component route, building columns and assembly stations. Allocate capacity to each bay, allow controlled positioning of large parts and standardize service where the installed fleet grows.
Prepare a comparable crane quotation.
Share the load schedule and site drawings. Plan the crane fleet from the component route, building columns and assembly stations. Allocate capacity to each bay, allow controlled positioning of large parts and standardize service where the installed fleet grows.
We can quote a single crane or a coordinated fleet. The offer sets out the destination standards, required certificates and inspection records, manufacturing programme after drawing approval, shipment, installation support and agreed acceptance scope.
- Largest machine component and rigging
- Bay heights and runway plan
- Assembly schedule
- Fleet maintenance and traffic rules
- Destination standards, quantity and inspection documentation
- Manufacturing programme, shipment, commissioning, training and spares
Questions before specifying a similar crane.
Can the same project crane be supplied for my site?
We customize the capacity, span, lifting height, attachment and controls to the load, building or yard layout and operating cycle. Largest machine component and rigging is one of the inputs to review before final equipment selection.
How are certification, quantity and lead time agreed?
Single-crane and fleet enquiries are welcome. Define the destination and required standards in the enquiry. The project offer confirms certification and inspection documents, the quantity, drawing approval and manufacturing schedule, with the shipping and site-service boundaries.
What should acceptance and after-sales support include?
Agree the inspection plan, representative load and functional tests, operator training, maintenance instructions, spare-parts scope and fault-recovery procedures. For this application, include fleet maintenance and traffic rules in the technical review.
Planning a similar lifting project?
Send your layout, load and operating requirements. We can develop a customized crane package and delivery scope for your site.