100+ Cranes for a Southeast Asian Steel Plant
More than 100 lifting systems connect steel production, slab transfer and a port scrap yard, including a 160 t double-girder overhead crane.
Read the project case ↗Compare molten-metal, furnace, slab and finished-steel handling in actual crane programmes.

More than 100 lifting systems connect steel production, slab transfer and a port scrap yard, including a 160 t double-girder overhead crane.

More than 100 lifting systems connect steel production, slab transfer and a port scrap yard, including a 160 t double-girder overhead crane.
Read the project case ↗Choose the operating environment, then review the project location, equipment and delivery or acceptance stage.

More than 100 lifting systems connect steel production, slab transfer and a port scrap yard, including a 160 t double-girder overhead crane.

Automated charging cranes coordinate attachment engagement, material transfer and hopper positioning for a ferrochrome production project.

Two coke pot cranes combine variable-frequency motion, remote video supervision and mechanical-assisted anti-sway for repeated process transfers.

A 450 t casting crane uses a four-girder, four-rail structure and integrated safety monitoring for molten-metal handling.

A 59-unit crane package includes four 32 t intelligent grab cranes for a 2,060 m³ blast furnace project.

More than 30 cranes include 200 t casting equipment and rotating electromagnetic-beam cranes for a 3.2-million-tonne special-steel project.

A 360 t casting crane combines whole-frame machining, redundant mechanisms and safety monitoring for heavy steelmaking lifts.

Two 200 t four-girder casting cranes supported a successful hot trial within an eight-crane heavy-lifting package.

A coke pot crane built for red-hot coke conditions combines automatic positioning, video supervision and lifecycle monitoring.

Thirty-four double-girder overhead cranes rated from 10 t to 100 t support a 4.5-million-tonne hot-rolling project.

Two grab cranes use 3D scanning and automatic material recognition, with positioning and repeatability within 5 mm for the furnace project.

A 50+50 t slab-handling crane uses electrically adjusted clamps and monitored motion for slabs exposed to temperatures above 650°C.
A project photo proves the configuration existed. Your purchase still needs a site-specific lifting envelope, duty, interfaces and delivery scope.
Maximum weight, rigging, pickup and placement points, travel distance and clearances.
Lifts per shift, load spectrum, temperature, wind, corrosion and protected-area classification.
Runway or rail, power feed, lifting attachment, controls, automation and emergency recovery.
Manufacturing documents, inspection, shipping limits, erection, testing, training and service.