Home/Case studies/Industrial Manufacturing/Automated Electro-Permanent Magnet Crane: Equipment Development Case
PROJECT CASE / INDUSTRIAL MANUFACTURING

Automated Electro-Permanent Magnet Crane: Equipment Development Case

A rigid-guide-column magnet beam crane combines automatic dispatch, twin hoist motors and electro-permanent magnetic lifting.

Automated overhead crane with an electro-permanent magnet lifting beam
Automated overhead crane with an electro-permanent magnet lifting beam.
INDUSTRYIndustrial Manufacturing
LOCATIONHenan Mine Crane, China
Load guidanceRigid guide-column anti-sway
PROJECT STAGEEquipment development
01 / PROJECT CONTEXT

The project and its handling task.

Henan Mine Crane developed an automated electromagnetic carrier-beam crane around digital control and a customized mechanical arrangement. The system is designed for automatic pickup and transfer of compatible ferrous loads.

Rigid guide columns provide anti-sway guidance. The hoisting arrangement uses two motors, and electro-permanent lifting magnets retain magnetization without continuous power for holding. Automatic crane avoidance in the same bay and nearest-position dispatch coordinate shared operating coverage.

02 / HANDLING REQUIREMENTS

Move steel stock automatically with retained magnetic grip.

Steel stock handling requires repeatable pickup, accurate placement and a safe response if electrical supply is interrupted.

Steel stock sizes and surface condition

Determine dimensions and pickup pattern for each target load.

Map every pickup and set-down position and define the route between them.

Verify magnet engagement before guided, anti-sway movement.

Define how the load is retained after power loss and how grip status is checked before movement.

Check the target position and safe demagnetization sequence.

Multi-crane avoidance rules

Check the target position and safe demagnetization sequence.

Automated overhead crane with an electro-permanent magnet lifting beam
Automated overhead crane with an electro-permanent magnet lifting beam.
03 / SUPPLIED SYSTEM

The equipment behind this project.

Rigid guide columns provide anti-sway guidance. The hoisting arrangement uses two motors, and electro-permanent lifting magnets retain magnetization without continuous power for holding. Automatic crane avoidance in the same bay and nearest-position dispatch coordinate shared operating coverage.

  • Load guidanceRigid guide-column anti-sway
  • Hoisting arrangementTwo hoist motors
  • AttachmentElectro-permanent magnetic lifting
  • Automatic schedulingSame-bay crane avoidance and nearest-position dispatch
  • Operating modesGround, remote and remote-station control
Explore the application solution ↗
04 / ENGINEERING DECISIONS

What to compare with your own project.

Match the project configuration to your load, layout and operating sequence before selecting a crane package.

Design areaThis project configurationDefine for your site
Load guidanceRigid guide-column anti-swayStock geometry, permitted sway and guide-column clearance.
Hoisting arrangementTwo hoist motorsComplete suspended load, hoist arrangement, load sharing and operating sequence.
AttachmentElectro-permanent magnetic liftingPower-loss and grip requirements. Define the required operating envelope and acceptance checks in your technical brief.
Automatic schedulingSame-bay crane avoidance and nearest-position dispatchMulti-crane avoidance rules. Define the required operating envelope and acceptance checks in your technical brief.
Operating modesGround, remote and remote-station controlOperator locations, visibility, control handover and recovery procedures.
05 / PROJECT PHOTOGRAPHS

See the equipment and working environment.

Explore the equipment arrangement and handling environment.

06 / PROJECT OUTCOME

Equipment development.

The development integrates mechanical guidance, magnetic attachment technology and automated dispatch. It provides an equipment approach for ferrous-material handling where pickup reliability and shared-bay coordination are central requirements.

For a similar project, configure a guided electromagnetic-beam crane around the stock dimensions and destination map. Electro-permanent magnets, rigid guidance, dual hoist motors and collision avoidance support automatic task dispatch with selectable local and remote modes.

07 / PLAN A SIMILAR PROJECT

Prepare a comparable crane quotation.

Share the load schedule and site drawings. Configure a guided electromagnetic-beam crane around the stock dimensions and destination map. Electro-permanent magnets, rigid guidance, dual hoist motors and collision avoidance support automatic task dispatch with selectable local and remote modes.

We can quote a single crane or a coordinated fleet. The offer sets out the destination standards, required certificates and inspection records, manufacturing programme after drawing approval, shipment, installation support and agreed acceptance scope.

  1. Steel stock sizes and surface condition
  2. Map every pickup and set-down position and define the route between them.
  3. Define how the load is retained after power loss and how grip status is checked before movement.
  4. Multi-crane avoidance rules
  5. Destination standards, quantity and inspection documentation
  6. Manufacturing programme, shipment, commissioning, training and spares
BUYER QUESTIONS

Questions before specifying a similar crane.

Can the same project crane be supplied for my site?

We configure capacity, span, lifting height, attachments and controls for your stock, site layout and operating cycle. Provide stock dimensions and surface-condition details for equipment selection.

How are certification, quantity and lead time agreed?

Single-crane and fleet enquiries are welcome. Define the destination and required standards in the enquiry. The project offer confirms certification and inspection documents, the quantity, drawing approval and manufacturing schedule, with the shipping and site-service boundaries.

What should acceptance and after-sales support include?

Agree the inspection plan, representative load and functional tests, operator training, maintenance instructions, spare-parts scope and fault-recovery procedures. For this application, include multi-crane avoidance rules in the technical review.