Project spotlight127-Unit Lifting-Equipment Export Programme Begins for an Egyptian Steel Plant
127 crane and equipment sets for an Egyptian steel plant. First export dispatch began on 3 September 2026.
Follow the dispatchBridge cranes for workshops and production lines.
Explore Overhead Cranes
Ground-supported lifting for yards and construction.
Explore Gantry Cranes
Wire rope and chain hoists for lifting points and cranes.
Explore Electric Hoists

Wire rope lifting and pulling with a powered drum.
Explore Electric Winches
Grab buckets, magnets and hooks for your load.
Explore Lifting Attachments & Grabs
Mobile handling for containers, precast and yard loads.
Explore Rubber-Tired Gantry Cranes & Straddle Carriers

Lift and move vessels through boatyards and marinas.
Explore Marine Travel Lifts
Ladle, slab, scrap and coil handling across steel production.

Container stacking and cargo transfers across terminals and rail.

Turbine installation, powerhouse maintenance and wind equipment assembly.

Controlled component transfer and positioning for precision assembly.

Heavy fabrication, production lifting and factory crane automation.

Process lifting for smelters, carbon blocks and anode materials.

Clean lifting and classified protection for sensitive process areas.

Bridge fabrication, metro construction and ship block assembly.

Automated storage and retrieval for plates, cables and bins.

Follow project dispatches, crane engineering and factory acceptance.

Dispatch, installation and equipment in service

Crane configurations and handling technology

Factory inspections, acceptance and test programmes

Company developments, people and community programmes
Follow crane deliveries, equipment developments and factory inspections. See the work behind your next lifting project.
Project spotlight127 crane and equipment sets for an Egyptian steel plant. First export dispatch began on 3 September 2026.
Follow the dispatchExplore deliveries, engineering and factory quality updates. Company news remains available in the complete archive.
180 updates for crane buyers
No updates match these filters. Try another topic, year or keyword.
Page 9 of 20 · Showing 73–81
Henan Mine held a practical turning competition during April 2025 Quality Month.
Read updateHenan Mine’s April 2025 inspection programme reviewed welded structures, precision components and assembled cranes.
Read updateHenan Mine dispatched a 550 t double-girder overhead crane for a nuclear-power project on 5 April 2025.
Read updateHenan Mine launched its 2025 Quality Month at the headquarters and intelligent industrial park on 31 March.
Read updateHenan Mine renewed its Kuangyuan brand-protection programme in March 2025, encouraging crane purchasers to verify equipment identity.
Read update40 t Henan Mine portal crane entered service at a port in February 2025.
Read updateHenan Mine’s forged-wheel manufacturing programme connects heating, forging, rolling, heat treatment and machining within an integrated production sequence.
Read update500 t Henan Mine overhead crane entered operation at Guoshi Heavy Industry in Qiqihar.
Read updateMore than seven hundred participants joined Henan Mine’s fifth crane-development forum on 25 January 2025.
Read updateShare the load, working area, lifting height and operating conditions. Site drawings and process layouts help define the equipment.