Skip to content
Henan mine crane co., ltd. Get a project quote
Henan Mine Crane · Steelmaking and foundry lifting

Metallurgical Overhead Cranes

Handle ladles, slabs, charging boxes and heat-treatment workpieces with dedicated process cranes. Compare eight configurations by lifting mechanism, load interface and production duty.

Henan mine crane co., ltd. YZS four-girder casting crane with main and auxiliary trolleys

Metallurgical electric-hoist cranes

Dedicated metallurgical hoists on single- or double-girder bridges for the specified foundry task.

Henan mine crane co., ltd. LDY single-girder bridge with electric hoist
LDY

LDY Metallurgical Single-Girder Overhead Crane

Move molten-metal ladles with a dedicated hoist on a single-girder bridge.

BridgeSingle girder
Lifting mechanismMetallurgical electric hoist
ApplicationSpecified molten-metal lifting
All specifications
Model LDY
Bridge arrangement Single girder overhead crane
Lifting mechanism Metallurgical electric hoist
Intended application Specified molten-metal handling
Rated-load basis State metal or workpiece, empty ladle or vessel, carrier/fixture and rigging weights separately; confirm the full suspended-load rating basis
Capacity, span and lifting height Selected for the actual load, runway and hook positions
Crane and mechanism duty Selected for the load spectrum and handling frequency
Hoisting and travel speeds Confirmed for the ordered hoist and crane
Ladle interface Hook, carrier and lifting-point geometry matched in the arrangement drawing
Protection package Redundancy and protection functions itemized for the selected molten-metal duty
Heat exposure Material temperature, ambient temperature, radiant source and exposure duration specified separately
Operator controls Specified for the route and operator visibility
Building interface Clearances, crane weight and wheel reactions supplied for the selected drawing
Power supply Voltage and frequency confirmed for the destination
Henan mine crane co., ltd. LHY double-girder bridge with metallurgical electric hoist
LHY

LHY Metallurgical Electric-Hoist Overhead Crane

Transfer molten-metal ladles with a metallurgical hoist on a double-girder bridge.

Lifting unitMetallurgical electric hoist
Load handlingHook for molten metal
Hoist protectionDual brakes and dual limits
All specifications
Model LHY
Bridge arrangement Double girder bridge
Lifting mechanism Metallurgical electric hoist
Lifting attachment Hook
Intended process Molten-metal handling in metallurgical operations
Hoist protection Dual braking, overload protection and dual limit protection
Capacity Selected for the vessel, metal and below-hook equipment
Span and lifting height Specified for the ladle route and building
Crane and mechanism duty Specified for the metallurgical cycle
Hoisting and travel speeds Confirmed for the ordered configuration
Heat exposure Process temperature, radiant heat and protection scope defined in the offer
Crane weight and wheel reactions Provided for the selected arrangement
Power supply Voltage and frequency confirmed in the technical offer
Rated-load basis State metal or workpiece, empty ladle or vessel, carrier/fixture and rigging weights separately; confirm the full suspended-load rating basis
LHY handling requirements Define the load and required motion for each task. Protection and any tipping function are specified for the ordered package.
Handling duty: Loaded-ladle transfer Load information: Metal + ladle + lifting equipment · Lifting/control requirement: Controlled pickup, transfer and placement speeds · Protection to specify: Double brakes, overload protection and dual limits
Handling duty: Pouring-station supply Load information: Ladle geometry and operating positions · Lifting/control requirement: Approach speed and any separate tilting device · Protection to specify: Heat exposure and operator visibility
Handling duty: Hot billet or metallurgical load Load information: Load temperature, attachment and maximum weight · Lifting/control requirement: Lifts/hour, travel distance and placement cycle · Protection to specify: Thermal/dust protection and selected duty

Ladle and casting overhead cranes

Compare winch-and-hook, double-girder casting and four-girder arrangements for the required ladle movement.

Henan mine crane co., ltd. YZD metallurgical bridge with main and auxiliary lifting hooks
YZD

YZD Metallurgical Hook Overhead Crane

Transfer ladles and support pouring tasks with a forged-hook metallurgical crane.

Rated options5 · 10 t; main/aux. options
Lifting interfaceForged hook and ladle carrier
Reference dutyA7
All specifications
Model YZD
Bridge arrangement Metallurgical bridge with a winch trolley
Lifting interface Forged hook with a compatible gantry-type ladle carrier
Rated-load basis State metal or workpiece, empty ladle or vessel, carrier/fixture and rigging weights separately; confirm the full suspended-load rating basis
Reference rated arrangements 5; 10; 16/3.2; 20/5; 32/5; 50/10; 74/20 t
Main and auxiliary ratings Separate lifting functions; do not add ratings into net metal payload
Reference spans 10.5–31.5 m for 5–50/10 t; 13.5–31.5 m for 74/20 t, matched in the table
Main and auxiliary hook heights Matched to the rated arrangement in the configuration table
Reference crane duty A7 for the reference configurations
Family duty options A6–A8 family description; selected project duty confirmed separately
Hoisting, trolley and bridge speeds Keep the rated arrangement and span paired with the listed speeds
Crane and trolley rails Separate rail recommendations in the matched rail table
Main thermal protection Insulating layer beneath the main girders
Hoisting and trolley-cable protection Steel-core wire rope and heat-resistant trolley cable routed within the walkway in the specified package
Motor insulation Class H metallurgical motor package
Safety protection Specified safety brake, hoist protections and crane monitoring functions
Motion controls Selected speed-control/VFD functions stated for the ordered package
Reference ambient temperature −10 to +60 °C for the reference A7 configurations; not metal temperature
Reference humidity Relative humidity ≤ 50% at +40 °C for the reference configurations
Reference supply Three-phase AC 380 V, 50 Hz for the listed configurations; ordered supply confirmed in the offer
YZD matched rated-load, span and motion configurations Reference duty: A7. Keep each load, span, height, speed and wheel reaction together. Main and auxiliary functions are separate. The dash indicates no auxiliary value; confirm the complete ladle and carrier load.
Main / aux load (t): 5 Span (m): 10.5 · Max main / aux lift (m): 16 / — · Main / aux hoist (m/min): 15.5 / — · Trolley (m/min): 37.2 · Bridge (m/min): 92.7 · Max wheel load (kN): 76 · Crane rail: P43
Main / aux load (t): 5 Span (m): 13.5 · Max main / aux lift (m): 16 / — · Main / aux hoist (m/min): 15.5 / — · Trolley (m/min): 37.2 · Bridge (m/min): 92.7 · Max wheel load (kN): 85 · Crane rail: P43
Main / aux load (t): 5 Span (m): 16.5 · Max main / aux lift (m): 16 / — · Main / aux hoist (m/min): 15.5 / — · Trolley (m/min): 37.2 · Bridge (m/min): 92.7 · Max wheel load (kN): 93 · Crane rail: P43
Main / aux load (t): 5 Span (m): 19.5 · Max main / aux lift (m): 16 / — · Main / aux hoist (m/min): 15.5 / — · Trolley (m/min): 37.2 · Bridge (m/min): 92.7 · Max wheel load (kN): 98 · Crane rail: P43
Main / aux load (t): 5 Span (m): 22.5 · Max main / aux lift (m): 16 / — · Main / aux hoist (m/min): 15.5 / — · Trolley (m/min): 37.2 · Bridge (m/min): 92.7 · Max wheel load (kN): 108 · Crane rail: P43
Main / aux load (t): 5 Span (m): 25.5 · Max main / aux lift (m): 16 / — · Main / aux hoist (m/min): 15.5 / — · Trolley (m/min): 37.2 · Bridge (m/min): 93.7 · Max wheel load (kN): 128 · Crane rail: P43
Main / aux load (t): 5 Span (m): 28.5 · Max main / aux lift (m): 16 / — · Main / aux hoist (m/min): 15.5 / — · Trolley (m/min): 37.2 · Bridge (m/min): 93.7 · Max wheel load (kN): 139 · Crane rail: P43
Main / aux load (t): 5 Span (m): 31.5 · Max main / aux lift (m): 16 / — · Main / aux hoist (m/min): 15.5 / — · Trolley (m/min): 37.2 · Bridge (m/min): 93.7 · Max wheel load (kN): 144 · Crane rail: P43
Main / aux load (t): 10 Span (m): 10.5 · Max main / aux lift (m): 16 / — · Main / aux hoist (m/min): 10.4 / — · Trolley (m/min): 43.8 · Bridge (m/min): 92.7 · Max wheel load (kN): 112 · Crane rail: P43
Main / aux load (t): 10 Span (m): 13.5 · Max main / aux lift (m): 16 / — · Main / aux hoist (m/min): 10.4 / — · Trolley (m/min): 43.8 · Bridge (m/min): 92.7 · Max wheel load (kN): 121 · Crane rail: P43
Main / aux load (t): 10 Span (m): 16.5 · Max main / aux lift (m): 16 / — · Main / aux hoist (m/min): 10.4 / — · Trolley (m/min): 43.8 · Bridge (m/min): 92.7 · Max wheel load (kN): 131 · Crane rail: P43
Main / aux load (t): 10 Span (m): 19.5 · Max main / aux lift (m): 16 / — · Main / aux hoist (m/min): 10.4 / — · Trolley (m/min): 43.8 · Bridge (m/min): 93.7 · Max wheel load (kN): 139 · Crane rail: P43
Main / aux load (t): 10 Span (m): 22.5 · Max main / aux lift (m): 16 / — · Main / aux hoist (m/min): 10.4 / — · Trolley (m/min): 43.8 · Bridge (m/min): 93.7 · Max wheel load (kN): 147 · Crane rail: P43
Main / aux load (t): 10 Span (m): 25.5 · Max main / aux lift (m): 16 / — · Main / aux hoist (m/min): 10.4 / — · Trolley (m/min): 43.8 · Bridge (m/min): 86.5 · Max wheel load (kN): 161 · Crane rail: P43
Main / aux load (t): 10 Span (m): 28.5 · Max main / aux lift (m): 16 / — · Main / aux hoist (m/min): 10.4 / — · Trolley (m/min): 43.8 · Bridge (m/min): 86.5 · Max wheel load (kN): 168 · Crane rail: P43
Main / aux load (t): 10 Span (m): 31.5 · Max main / aux lift (m): 16 / — · Main / aux hoist (m/min): 10.4 / — · Trolley (m/min): 43.8 · Bridge (m/min): 86.5 · Max wheel load (kN): 185 · Crane rail: P43
Main / aux load (t): 16/3.2 Span (m): 10.5 · Max main / aux lift (m): 16 / 18 · Main / aux hoist (m/min): 10.7 / 14.6 · Trolley (m/min): 44.6 · Bridge (m/min): 76 · Max wheel load (kN): 163 · Crane rail: P43 / QU70
Main / aux load (t): 16/3.2 Span (m): 13.5 · Max main / aux lift (m): 16 / 18 · Main / aux hoist (m/min): 10.7 / 14.6 · Trolley (m/min): 44.6 · Bridge (m/min): 76 · Max wheel load (kN): 174 · Crane rail: P43 / QU70
Main / aux load (t): 16/3.2 Span (m): 16.5 · Max main / aux lift (m): 16 / 18 · Main / aux hoist (m/min): 10.7 / 14.6 · Trolley (m/min): 44.6 · Bridge (m/min): 76 · Max wheel load (kN): 187 · Crane rail: P43 / QU70
Main / aux load (t): 16/3.2 Span (m): 19.5 · Max main / aux lift (m): 16 / 18 · Main / aux hoist (m/min): 10.7 / 14.6 · Trolley (m/min): 44.6 · Bridge (m/min): 89 · Max wheel load (kN): 203 · Crane rail: P43 / QU70
Main / aux load (t): 16/3.2 Span (m): 22.5 · Max main / aux lift (m): 16 / 18 · Main / aux hoist (m/min): 10.7 / 14.6 · Trolley (m/min): 44.6 · Bridge (m/min): 89 · Max wheel load (kN): 214 · Crane rail: P43 / QU70
Main / aux load (t): 16/3.2 Span (m): 25.5 · Max main / aux lift (m): 16 / 18 · Main / aux hoist (m/min): 10.7 / 14.6 · Trolley (m/min): 44.6 · Bridge (m/min): 89 · Max wheel load (kN): 227 · Crane rail: P43 / QU70
Main / aux load (t): 16/3.2 Span (m): 28.5 · Max main / aux lift (m): 16 / 18 · Main / aux hoist (m/min): 10.7 / 14.6 · Trolley (m/min): 44.6 · Bridge (m/min): 89 · Max wheel load (kN): 241 · Crane rail: P43 / QU70
Main / aux load (t): 16/3.2 Span (m): 31.5 · Max main / aux lift (m): 16 / 18 · Main / aux hoist (m/min): 10.7 / 14.6 · Trolley (m/min): 44.6 · Bridge (m/min): 89 · Max wheel load (kN): 254 · Crane rail: P43 / QU70
Main / aux load (t): 20/5 Span (m): 10.5 · Max main / aux lift (m): 12 / 14 · Main / aux hoist (m/min): 9.8 / 15.5 · Trolley (m/min): 44.6 · Bridge (m/min): 76 · Max wheel load (kN): 195 · Crane rail: P43 / QU70
Main / aux load (t): 20/5 Span (m): 13.5 · Max main / aux lift (m): 12 / 14 · Main / aux hoist (m/min): 9.8 / 15.5 · Trolley (m/min): 44.6 · Bridge (m/min): 76 · Max wheel load (kN): 209 · Crane rail: P43 / QU70
Main / aux load (t): 20/5 Span (m): 16.5 · Max main / aux lift (m): 12 / 14 · Main / aux hoist (m/min): 9.8 / 15.5 · Trolley (m/min): 44.6 · Bridge (m/min): 76 · Max wheel load (kN): 220 · Crane rail: P43 / QU70
Main / aux load (t): 20/5 Span (m): 19.5 · Max main / aux lift (m): 12 / 14 · Main / aux hoist (m/min): 9.8 / 15.5 · Trolley (m/min): 44.6 · Bridge (m/min): 89 · Max wheel load (kN): 244 · Crane rail: P43 / QU70
Main / aux load (t): 20/5 Span (m): 22.5 · Max main / aux lift (m): 12 / 14 · Main / aux hoist (m/min): 9.8 / 15.5 · Trolley (m/min): 44.6 · Bridge (m/min): 89 · Max wheel load (kN): 255 · Crane rail: P43 / QU70
Main / aux load (t): 20/5 Span (m): 25.5 · Max main / aux lift (m): 12 / 14 · Main / aux hoist (m/min): 9.8 / 15.5 · Trolley (m/min): 44.6 · Bridge (m/min): 89 · Max wheel load (kN): 267 · Crane rail: P43 / QU70
Main / aux load (t): 20/5 Span (m): 28.5 · Max main / aux lift (m): 12 / 14 · Main / aux hoist (m/min): 9.8 / 15.5 · Trolley (m/min): 44.6 · Bridge (m/min): 89 · Max wheel load (kN): 282 · Crane rail: P43 / QU70
Main / aux load (t): 20/5 Span (m): 31.5 · Max main / aux lift (m): 12 / 14 · Main / aux hoist (m/min): 9.8 / 15.5 · Trolley (m/min): 44.6 · Bridge (m/min): 89 · Max wheel load (kN): 296 · Crane rail: P43 / QU70
Main / aux load (t): 32/5 Span (m): 10.5 · Max main / aux lift (m): 16 / 18 · Main / aux hoist (m/min): 7.8 / 15.5 · Trolley (m/min): 42.4 · Bridge (m/min): 89 · Max wheel load (kN): 279 · Crane rail: QU70
Main / aux load (t): 32/5 Span (m): 13.5 · Max main / aux lift (m): 16 / 18 · Main / aux hoist (m/min): 7.8 / 15.5 · Trolley (m/min): 42.4 · Bridge (m/min): 89 · Max wheel load (kN): 300 · Crane rail: QU70
Main / aux load (t): 32/5 Span (m): 16.5 · Max main / aux lift (m): 16 / 18 · Main / aux hoist (m/min): 7.8 / 15.5 · Trolley (m/min): 42.4 · Bridge (m/min): 89 · Max wheel load (kN): 312 · Crane rail: QU70
Main / aux load (t): 32/5 Span (m): 19.5 · Max main / aux lift (m): 16 / 18 · Main / aux hoist (m/min): 7.8 / 15.5 · Trolley (m/min): 42.4 · Bridge (m/min): 75.3 · Max wheel load (kN): 347 · Crane rail: QU70
Main / aux load (t): 32/5 Span (m): 22.5 · Max main / aux lift (m): 16 / 18 · Main / aux hoist (m/min): 7.8 / 15.5 · Trolley (m/min): 42.4 · Bridge (m/min): 75.3 · Max wheel load (kN): 355 · Crane rail: QU70
Main / aux load (t): 32/5 Span (m): 25.5 · Max main / aux lift (m): 16 / 18 · Main / aux hoist (m/min): 7.8 / 15.5 · Trolley (m/min): 42.4 · Bridge (m/min): 75.3 · Max wheel load (kN): 372 · Crane rail: QU70
Main / aux load (t): 32/5 Span (m): 28.5 · Max main / aux lift (m): 16 / 18 · Main / aux hoist (m/min): 7.8 / 15.5 · Trolley (m/min): 42.4 · Bridge (m/min): 75.3 · Max wheel load (kN): 384 · Crane rail: QU70
Main / aux load (t): 32/5 Span (m): 31.5 · Max main / aux lift (m): 16 / 18 · Main / aux hoist (m/min): 7.8 / 15.5 · Trolley (m/min): 42.4 · Bridge (m/min): 75.3 · Max wheel load (kN): 404 · Crane rail: QU70
Main / aux load (t): 50/10 Span (m): 10.5 · Max main / aux lift (m): 12 / 16 · Main / aux hoist (m/min): 7.8 / 10.4 · Trolley (m/min): 39.3 · Bridge (m/min): 75 · Max wheel load (kN): 377 · Crane rail: QU80
Main / aux load (t): 50/10 Span (m): 13.5 · Max main / aux lift (m): 12 / 16 · Main / aux hoist (m/min): 7.8 / 10.4 · Trolley (m/min): 39.3 · Bridge (m/min): 75 · Max wheel load (kN): 412 · Crane rail: QU80
Main / aux load (t): 50/10 Span (m): 16.5 · Max main / aux lift (m): 12 / 16 · Main / aux hoist (m/min): 7.8 / 10.4 · Trolley (m/min): 39.3 · Bridge (m/min): 75 · Max wheel load (kN): 438 · Crane rail: QU80
Main / aux load (t): 50/10 Span (m): 19.5 · Max main / aux lift (m): 12 / 16 · Main / aux hoist (m/min): 7.8 / 10.4 · Trolley (m/min): 39.3 · Bridge (m/min): 75 · Max wheel load (kN): 458 · Crane rail: QU80
Main / aux load (t): 50/10 Span (m): 22.5 · Max main / aux lift (m): 12 / 16 · Main / aux hoist (m/min): 7.8 / 10.4 · Trolley (m/min): 39.3 · Bridge (m/min): 76.6 · Max wheel load (kN): 482 · Crane rail: QU80
Main / aux load (t): 50/10 Span (m): 25.5 · Max main / aux lift (m): 12 / 16 · Main / aux hoist (m/min): 7.8 / 10.4 · Trolley (m/min): 39.3 · Bridge (m/min): 76.6 · Max wheel load (kN): 504 · Crane rail: QU80
Main / aux load (t): 50/10 Span (m): 28.5 · Max main / aux lift (m): 12 / 16 · Main / aux hoist (m/min): 7.8 / 10.4 · Trolley (m/min): 39.3 · Bridge (m/min): 76.6 · Max wheel load (kN): 521 · Crane rail: QU80
Main / aux load (t): 50/10 Span (m): 31.5 · Max main / aux lift (m): 12 / 16 · Main / aux hoist (m/min): 7.8 / 10.4 · Trolley (m/min): 39.3 · Bridge (m/min): 76.6 · Max wheel load (kN): 537 · Crane rail: QU80
Main / aux load (t): 74/20 Span (m): 13.5 · Max main / aux lift (m): 22 / 24 · Main / aux hoist (m/min): 6.1 / 9.7 · Trolley (m/min): 33.8 · Bridge (m/min): 67.3 · Max wheel load (kN): 300 · Crane rail: QU100
Main / aux load (t): 74/20 Span (m): 16.5 · Max main / aux lift (m): 22 / 24 · Main / aux hoist (m/min): 6.1 / 9.7 · Trolley (m/min): 33.8 · Bridge (m/min): 67.3 · Max wheel load (kN): 314 · Crane rail: QU100
Main / aux load (t): 74/20 Span (m): 19.5 · Max main / aux lift (m): 22 / 24 · Main / aux hoist (m/min): 6.1 / 9.7 · Trolley (m/min): 33.8 · Bridge (m/min): 67.3 · Max wheel load (kN): 326 · Crane rail: QU100
Main / aux load (t): 74/20 Span (m): 22.5 · Max main / aux lift (m): 22 / 24 · Main / aux hoist (m/min): 6.1 / 9.7 · Trolley (m/min): 33.8 · Bridge (m/min): 67.3 · Max wheel load (kN): 334 · Crane rail: QU100
Main / aux load (t): 74/20 Span (m): 25.5 · Max main / aux lift (m): 22 / 24 · Main / aux hoist (m/min): 6.1 / 9.7 · Trolley (m/min): 33.8 · Bridge (m/min): 67.3 · Max wheel load (kN): 345 · Crane rail: QU100
Main / aux load (t): 74/20 Span (m): 28.5 · Max main / aux lift (m): 22 / 24 · Main / aux hoist (m/min): 6.1 / 9.7 · Trolley (m/min): 33.8 · Bridge (m/min): 67.3 · Max wheel load (kN): 355 · Crane rail: QU100
Main / aux load (t): 74/20 Span (m): 31.5 · Max main / aux lift (m): 22 / 24 · Main / aux hoist (m/min): 6.1 / 9.7 · Trolley (m/min): 33.8 · Bridge (m/min): 67.3 · Max wheel load (kN): 364 · Crane rail: QU100
YZD trolley and crane-runway rail selections Trolley and runway rails serve different locations. Values in kg/m are rail mass per length; P43 and QU identify rail profiles. Select rails with the ordered wheel reactions.
Rated arrangement (t): 5 and 10 Trolley rail: 18 kg/m · Crane runway rail: P43
Rated arrangement (t): 16/3.2 and 20/5 Trolley rail: 24 kg/m · Crane runway rail: P43 / QU70
Rated arrangement (t): 32/5 Trolley rail: P43 · Crane runway rail: QU70
Rated arrangement (t): 50/10 Trolley rail: P43 · Crane runway rail: QU80
Rated arrangement (t): 74/20 Trolley rail: P43 · Crane runway rail: QU100
Henan mine crane co., ltd. YZ casting-crane bridge and main and auxiliary hoisting arrangement
YZ

YZ Double-Girder Casting Overhead Crane

Carry and pour ladles with a double-girder casting bridge and matched carrier.

Reference ratings100/32–200/50 t, main/auxiliary
Lifting interfaceGantry-type ladle carrier
Reference dutyA7
All specifications
Model YZ
Bridge arrangement Double girder casting crane
Lifting interface Gantry-type ladle carrier; auxiliary hook function as selected
Intended work Molten-metal transfer, pouring and hot-metal charging
Rated-load basis State metal or workpiece, empty ladle or vessel, carrier/fixture and rigging weights separately; confirm the full suspended-load rating basis
Reference main / auxiliary ratings 100/32; 125/32; 140/40; 160/50; 200/50 t
Reference spans and hook heights Keep the capacity/span/main-and-auxiliary lift combinations together
Reference duty A7
Hoisting and travel speeds Numerical ordered speeds confirmed in the technical offer
Hoist speed control Stator-voltage speed regulation in the specified package
Travel speed control Variable-frequency travel in the specified package
Thermal protection Heat insulation of key bridge structures and components
Controls and monitoring PLC/HMI and safety monitoring in the specified package
Upper hoist protection Dual overtravel protection described; devices and test scope identified in the order
Reference rail QU120 for the listed configurations
Reference supply Three-phase AC 380 V, 50 Hz for the reference selections
YZ matched main and auxiliary lifting configurations Each row pairs the load with its span, separate main and auxiliary lifting heights, wheel reaction, rail and duty. Main and auxiliary ratings are not added and do not state net metal payload.
Main / aux load (t): 100/32 Span (m): 19 · Main hook lifting height (m): 18 · Auxiliary hook lifting height (m): 20 · Max wheel load (kN): 520 · Crane rail: QU120 · Duty: A7
Main / aux load (t): 100/32 Span (m): 22 · Main hook lifting height (m): 20 · Auxiliary hook lifting height (m): 22 · Max wheel load (kN): 530 · Crane rail: QU120 · Duty: A7
Main / aux load (t): 100/32 Span (m): 25 · Main hook lifting height (m): 25 · Auxiliary hook lifting height (m): 27 · Max wheel load (kN): 545 · Crane rail: QU120 · Duty: A7
Main / aux load (t): 125/32 Span (m): 19 · Main hook lifting height (m): 24 · Auxiliary hook lifting height (m): 26 · Max wheel load (kN): 580 · Crane rail: QU120 · Duty: A7
Main / aux load (t): 125/32 Span (m): 22 · Main hook lifting height (m): 20 · Auxiliary hook lifting height (m): 22 · Max wheel load (kN): 595 · Crane rail: QU120 · Duty: A7
Main / aux load (t): 140/40 Span (m): 19 · Main hook lifting height (m): 23 · Auxiliary hook lifting height (m): 25 · Max wheel load (kN): 640 · Crane rail: QU120 · Duty: A7
Main / aux load (t): 140/40 Span (m): 22 · Main hook lifting height (m): 23 · Auxiliary hook lifting height (m): 25 · Max wheel load (kN): 650 · Crane rail: QU120 · Duty: A7
Main / aux load (t): 140/40 Span (m): 25 · Main hook lifting height (m): 23 · Auxiliary hook lifting height (m): 25 · Max wheel load (kN): 665 · Crane rail: QU120 · Duty: A7
Main / aux load (t): 160/50 Span (m): 19 · Main hook lifting height (m): 24 · Auxiliary hook lifting height (m): 26 · Max wheel load (kN): 404 · Crane rail: QU120 · Duty: A7
Main / aux load (t): 160/50 Span (m): 22 · Main hook lifting height (m): 24 · Auxiliary hook lifting height (m): 26 · Max wheel load (kN): 412 · Crane rail: QU120 · Duty: A7
Main / aux load (t): 160/50 Span (m): 25 · Main hook lifting height (m): 24 · Auxiliary hook lifting height (m): 26 · Max wheel load (kN): 420 · Crane rail: QU120 · Duty: A7
Main / aux load (t): 200/50 Span (m): 19 · Main hook lifting height (m): 24 · Auxiliary hook lifting height (m): 26 · Max wheel load (kN): 505 · Crane rail: QU120 · Duty: A7
Main / aux load (t): 200/50 Span (m): 22 · Main hook lifting height (m): 24 · Auxiliary hook lifting height (m): 26 · Max wheel load (kN): 515 · Crane rail: QU120 · Duty: A7
Main / aux load (t): 200/50 Span (m): 25 · Main hook lifting height (m): 24 · Auxiliary hook lifting height (m): 26 · Max wheel load (kN): 530 · Crane rail: QU120 · Duty: A7
Henan mine crane co., ltd. YZS four-girder casting crane with main and auxiliary trolleys
YZS

YZS Four-Girder Casting Overhead Crane

Move and tip ladles with separate main and auxiliary trolleys on a four-girder bridge.

Main / auxiliary ratings125/32–320/80 t reference
TrolleysMain + auxiliary
Reference dutyA7
All specifications
Model YZS
Bridge structure Four girders with four or six trolley rails
Trolley arrangement Separate main and auxiliary trolleys on separate tracks
Main lifting device Fixed double-point gantry-type plate-hook lifting device
Auxiliary lifting device Forged hook
Reference main / auxiliary ratings 125/32; 140/32; 160/32; 180/50; 200/50; 225/65; 240/80; 280/80; 320/80 t
Span, paired with capacity 125/32: 19; 140/32: 19; 160/32: 27; 180/50: 28.5; 200/50: 28; 225/65: 27; 240/80: 22; 280/80: 22; 320/80: 24.5 m
Lifting heights Main and auxiliary heights remain paired in the configuration table
Reference duty A7 for all nine listed configurations
Family duty description A6–A8 in the family range; the tabulated selections are A7
Maximum wheel loads 505 / 535 / 485 / 525 / 530 / 550 / 545 / 735 / 750 kN in the same capacity order
Reference crane rail QU120 for all listed configurations
Reference power supply Three-phase AC 380 V, 50 Hz for the listed selections
Thermal protection Heat insulation for key bridge structures and components
Controls PLC and inverter communication control with safety monitoring
Motion speeds Confirmed for the ordered main, auxiliary and bridge motions
Rated-load basis State metal or workpiece, empty ladle or vessel, carrier/fixture and rigging weights separately; confirm the full suspended-load rating basis
Main hoist overtravel protection Rotary and weighted limit devices in the specified package; final functional scope confirmed in the order
YZS matched main and auxiliary lifting configurations Each A7 reference keeps main and auxiliary ratings and lifting heights separate. Confirm the ordered motion speeds and complete suspended load.
Main / auxiliary load (t): 125/32 Span (m): 19 · Main / auxiliary lift (m): 24 / 26 · Max wheel load (kN): 505 · Crane rail: QU120 · Duty: A7
Main / auxiliary load (t): 140/32 Span (m): 19 · Main / auxiliary lift (m): 22 / 24 · Max wheel load (kN): 535 · Crane rail: QU120 · Duty: A7
Main / auxiliary load (t): 160/32 Span (m): 27 · Main / auxiliary lift (m): 25 / 26 · Max wheel load (kN): 485 · Crane rail: QU120 · Duty: A7
Main / auxiliary load (t): 180/50 Span (m): 28.5 · Main / auxiliary lift (m): 27 / 29 · Max wheel load (kN): 525 · Crane rail: QU120 · Duty: A7
Main / auxiliary load (t): 200/50 Span (m): 28 · Main / auxiliary lift (m): 26 / 26 · Max wheel load (kN): 530 · Crane rail: QU120 · Duty: A7
Main / auxiliary load (t): 225/65 Span (m): 27 · Main / auxiliary lift (m): 32 / 34 · Max wheel load (kN): 550 · Crane rail: QU120 · Duty: A7
Main / auxiliary load (t): 240/80 Span (m): 22 · Main / auxiliary lift (m): 25 / 27 · Max wheel load (kN): 545 · Crane rail: QU120 · Duty: A7
Main / auxiliary load (t): 280/80 Span (m): 22 · Main / auxiliary lift (m): 29 / 29 · Max wheel load (kN): 735 · Crane rail: QU120 · Duty: A7
Main / auxiliary load (t): 320/80 Span (m): 24.5 · Main / auxiliary lift (m): 28 / 32 · Max wheel load (kN): 750 · Crane rail: QU120 · Duty: A7

Slab-handling overhead cranes

Match the slab tong, gripping range and crane to the steel products being transferred.

Henan mine crane co., ltd. YB slab-handling bridge with suspended mechanical tong
YB

YB Slab-Handling Overhead Crane

Handle and stack hot or cooled slabs with a matched slab-gripping attachment.

Handled productHot or cooled slabs
ProcessTransfer, stacking and loading
Lifting interfaceSelected slab clamp
All specifications
Model YB
Application Slab transfer, stacking and loading at continuous-casting lines and finished-product stores
Bridge arrangement Specialized metallurgical overhead bridge
Lifting attachment Slab clamp matched to the slab and gripping surfaces
Rated-load basis Slab mass plus clamp and suspended equipment specified separately
Slab dimensions and grip Minimum/maximum length, width, thickness and permitted contact surfaces
Capacity, span and lifting height Configured to the production and storage layout
Duty and numerical motion speeds Selected from the slab-handling cycle
Thermal protection Heat insulation for key bridge structures described for hot-slab service
Controls PLC and HMI with selected operating functions
Weighing and position functions Defined where ordered; no universal accuracy or automation target inferred
Power supply Voltage and frequency confirmed for the destination
YB slab-handling selection conditions Specify the slab and process inputs for the selected clamp. Sensing, weighing, protection and operating functions are included as agreed for the ordered package.
Operating requirement: Hot caster-output transfer Slab information: Mass, surface temperature and pickup position · Attachment and motion selection: Clamp gripping range and transfer cycle · Protection/control scope: Radiant-heat shielding and protected equipment
Operating requirement: Cold slab storage Slab information: Minimum/maximum dimensions and stack pattern · Attachment and motion selection: Clamp opening, stack access and placement speed · Protection/control scope: Operator controls; weighing/position functions where ordered
Operating requirement: Mixed slab sizes Slab information: Complete size range and permitted gripping surfaces · Attachment and motion selection: Adjustable clamp range within the defined envelope · Protection/control scope: Selected sensing and attachment controls
Operating requirement: Loading or process supply Slab information: Dispatch position, moves/hour and travel distance · Attachment and motion selection: Complete suspended-load rating and motion speeds · Protection/control scope: Process interface and handling interlocks where ordered

Charging and quenching cranes

Select the lifting arrangement and motion cycle for box tipping or furnace-to-quench transfer.

Henan mine crane co., ltd. YX charging-box bridge with two lifting trolleys
YX

YX Charging-Box Overhead Crane

Lift, transfer and tip charging boxes around the steelmaking process.

Handling taskCharging-box transfer and tipping
Family dutyA6–A7
Load inputsBox, contents and attachment
All specifications
Model YX
Application Lifting, moving and tipping material boxes during metallurgical smelting
Rated-load basis Charging-box tare, maximum contents and suspended attachments stated separately
Family duty options A6–A7; ordered duty matched to the load spectrum
Capacity, span and lifting height Configured for the box, receiving point and workshop route
Lifting and trolley arrangement Selected for the transfer and tipping load cases
Dual-trolley functions Electrical coordination for shared lifting and tipping; permitted movements defined in the order
Motion speeds Selected for the approved load cases and tipping sequence
Controls PLC and HMI operating package
Load measurement Hoist electronic weighing can display and record material weight in the described system
Thermal protection Heat-resistant components or protective shields for furnace-area radiation
Motor insulation Class H motors in the specified package
Box interface Lifting points, hook spacing, tipping connection and changing reactions confirmed in the drawing
Power supply Voltage and frequency confirmed in the electrical specification
YX separate charging-box load cases Pickup, loaded travel, tipping and empty return are separate load cases. Define permitted motions and changing reactions; two ratings do not automatically add into a shared lifting capacity.
Operating mode: Filled-box pickup Load to consider: Box + contents + suspended attachment · Crane function: Controlled lift from the pickup position · Configuration selected: Box connections, hook positions and individual lifting reactions
Operating mode: Loaded-box transfer Load to consider: Full suspended load · Crane function: Lifting and workshop travel · Configuration selected: Working route, travel speeds and thermal exposure
Operating mode: Coordinated tipping Load to consider: Changing reactions through the tipping cycle · Crane function: Specified relative lifting / trolley movements · Configuration selected: Discharge angle, clearances, load limits and control sequence
Operating mode: Empty-box return Load to consider: Empty box + suspended attachment · Crane function: Return and placement · Configuration selected: Empty-load speeds, set-down position and operating cycle
Henan mine crane co., ltd. YH quenching-crane bridge and lifting trolley
YH

YH Quenching Overhead Crane

Lower hot workpieces into a quench bath along the specified heat-treatment cycle.

ProcessFurnace-to-bath handling
Lifting dutyRapid quench movement
PackageWorkpiece and fixture matched
All specifications
Model YH
Application Rapid immersion of hot workpieces in quenching liquid during heat treatment
Rated-load basis Workpiece, fixture, rigging and any retained-fluid load defined for the process
Capacity, span and lifting height Selected for furnace exit, transfer route and bath geometry
Duty and numerical speeds Selected for the required transfer interval and immersion profile
Lifting interface Fixture and lifting points matched to the hot workpiece
Thermal protection Heat insulation for main/end girders and other exposed components
Braking and emergency power Double brakes and an emergency-power package; required response agreed for each process stage
Automation option Programmed positioning, lifting and lowering functions can be specified
Bath interface Opening, liquid level, working depth, clearances and immersion stroke
Controls and acceptance Transfer, entry, withdrawal and power-interruption responses verified against agreed conditions
Power supply Normal and any emergency-supply requirements confirmed in the offer
YH quenching-cycle requirements Match the workpiece, fixture, bath and transfer interval to the process. Speeds, emergency response and acceptance conditions are agreed for the ordered equipment.
Process stage: Pickup and furnace exit Requirement to define: Hot workpiece/fixture mass, orientation and pickup level · Crane configuration: Attachment, vertical stroke and lifting speed · Acceptance result: Required clearance from the pickup position
Process stage: Furnace-to-bath transfer Requirement to define: Distance and maximum transfer interval · Crane configuration: Travel speeds, acceleration and positioning · Acceptance result: Complete transfer within the agreed interval
Process stage: Bath approach and immersion Requirement to define: Opening, liquid level, depth and entry conditions · Crane configuration: Approach speed, lowering profile and immersion stroke · Acceptance result: Required immersion position and timing
Process stage: Withdrawal and return Requirement to define: Extraction profile, retained fluid and placement position · Crane configuration: Selected raising speed and travel sequence · Acceptance result: Controlled extraction and placement
Process stage: Power interruption Requirement to define: Required response at each process stage · Crane configuration: Double brakes, emergency power and control functions · Acceptance result: Specified response verified at commissioning

Rate the complete suspended load, including the ladle, box, clamp, fixture and rigging. Main and auxiliary ratings identify separate lifting functions; they are not an automatic combined capacity or net material payload.

Budget planning

Metallurgical crane price range and supply scope

Compare the complete crane, load interface, heat protection and operating package. The USD reference below covers two hook-type ladle-crane configurations.

Reference equipment prices and supply scope
Factor Price implication
Two hook-type ladle-crane configurations Approx. USD 320,000–390,000 per crane. Indicative equipment range across the two configurations below.
Configurations covered by the range 125/50 t main/aux.; 19 m span; 13/15 m lift; A7; cabin + remote. Also 150/50 t main/aux.; 25.5 m span; 25/27 m lift; A7; cabin.
Complete load and process attachment Filled-ladle weight, lifting points, carrier or clamp, tipping movement and hook coverage affect the crane package.
Heat exposure and operating cycle Ambient and radiant heat, operating hours, load spectrum and required motion sequence affect structure, protection, drives and controls.
Delivery and site scope Itemize the crane, selected attachment, power feed, rails, freight, erection, commissioning and required tests.

Indicative equipment budget for the two configurations shown. It does not price every metallurgical crane or every configuration between them. Main and auxiliary ratings are separate and do not state net molten-metal payload. Confirm the ladle and carrier scope, attachment mass, trade terms, taxes, freight, erection and commissioning in an itemized quotation.

Send the process, maximum complete suspended load, approximate span and hook travel, and project location for a configured offer. Add a layout or ladle drawing if available.

Get a quote for your configuration
Project experience

Two 200 t Casting Cranes for Jinhui Group

Two 200 t four-girder casting cranes supported hot commissioning at Jinhui Group’s green and intelligent upgrade project. The project included eight large-tonnage four-girder casting cranes designed and manufactured by Henan Mine Crane.

The 200 t equipment handles loaded steel ladles for refining. Speed regulation, monitoring and fault-detection functions were specified for the project.

View project
Henan mine crane co., ltd. four-girder casting equipment at Jinhui Group’s hot-commissioning project
Four-girder casting equipment for Jinhui Group’s refining project.

Metallurgical overhead crane buying questions

How do I choose a crane for molten-metal ladle handling?

Start with the complete ladle load, lifting points and required pouring or transfer movement. Specify a complete crane for that molten-metal duty, including the lifting mechanism, protective equipment and operating conditions. A general overhead crane or a hoist component alone does not define the required package.

Does a 125/50 t rating mean 175 t of steel?

No. The figures identify separate main and auxiliary lifting ratings. They do not establish an added capacity or net steel payload. The ladle, lifting beam, hooks, slings and contents must be considered in the permitted load cases, including any pouring or tipping movement.

What should I send for a quotation?

Send the process task, complete lifted load, span, required lifting height and project location. Add the ladle, slab, box or fixture dimensions and a route sketch if available. State heat exposure, operating hours and any pouring, tipping or immersion sequence.

Compare the range

Metallurgical overhead crane specification comparison

Compare the process, lifting arrangement, rated configuration, span, lift and duty. Select a full product name for details.

Swipe across the table to compare specifications.

Model / product Arrangement Capacity Span / working width Lifting height Working class
LDY Metallurgical Single-Girder Overhead Crane Single girder; metallurgical hoist To complete load To workshop layout To ladle route To handling cycle
LHY Metallurgical Electric-Hoist Overhead Crane Double girder; metallurgical hoist To complete load To workshop layout To ladle route To handling cycle
YZD Metallurgical Hook Overhead Crane Winch trolley; forged hook and carrier 5 and 10 t; 16/3.2–74/20 t main/aux. 10.5–31.5 m by rating Main/aux. heights paired by rating A7 reference
YZ Double-Girder Casting Overhead Crane Double girder; ladle carrier 100/32–200/50 t main/aux. options 19 / 22 / 25 m by rating Main 18–25 m; aux. 20–27 m, paired A7 reference
YZS Four-Girder Casting Overhead Crane Four girders; separate main/aux. trolleys 125/32–320/80 t main/aux. options 19–28.5 m, paired by rating Main/aux. heights paired by rating A7 reference
YB Slab-Handling Overhead Crane Bridge crane with slab clamp To slab and clamp load To transfer and stacking area To storage and pickup levels To slab-handling cycle
YX Charging-Box Overhead Crane Charging-box transfer and tipping To box, contents and attachment To charging route To pickup and tipping positions A6–A7 family options
YH Quenching Overhead Crane Heat-treatment transfer and immersion To workpiece and fixture load To furnace and bath layout To transfer and immersion stroke To quenching cycle

Reference values belong to the listed configuration. The ordered drawing confirms attachments, separate lifting functions, clearances, wheel reactions, protection and operating duty together.

Get a metallurgical crane quote

Send the lifting task, complete load, span, lifting height and destination. Add a drawing or photograph of the load if available.

Include any pouring, box-tipping or quench sequence and the expected heat exposure.

Request a quotation